IMG 20220725 190049259 PORTRAIT 1 scaled

Cas Practiques Réfrigération industrielle

Logistics and Services Jañez

Problem

Excessive increase in energy costs, after increasing the available square footage for cold storage at the facility.

This situation directly impacted the supply chain and logistics, operating costs, and energy and technological efficiency.

Solution

An optimization strategy was designed focused on energy monitoring and management of the cold storage units, seeking to maximize savings with minimal investment.

The savings were achieved by adjusting the contracted power, unlocking the possibility of investing in customized equipment for the cold storage units.

With this system in place, other energy-related weaknesses were identified that could be optimized, such as air conditioning.

Photovoltaic panels were installed to strengthen the sustainable approach.

Benefit

Energy savings of 58% in May 2022 compared to May 2021.
– Reduction in operating costs.
– Improved competitiveness and job security.

Name