Performance optimization
Take saving actions with the best information.
Energy savings Measurement and Verification (M&V)
Energy savings standardization by performance improvement using IPMVP protocol from EVO.
Reference baseline
Set your Energy Services baseline as the reference for future energy savings actions
Lifetime cycle HVAC&R systems improvement
Lifetime cycle HVAC&R systems improvement with periodic performance inspections.
Energy Management
Cost assignments, dashboards, KPI, ratios, comparatives and reports.
Increase equipment and systems reliability
Reduce HVAC&R systems failure rate and downtime by continuous monitoring.
I want to test PilotE²
If you are interested to test PilotE² HVACR or would like more information, please contact us.
Juan Carlos García Carrizo
Energy Efficiency and Automation Engineer